Robertson’s Ready Mix Preps For HydroZilla Version 8

Robertson’s Ready Mix was one of HydroFuture’s first testing sites and became one of the most important Beta sites HydroFuture has.  Due to data collected and trials of various systems and components on Robertson’s trucks, HydroFuture was able to raise the bar in development and move quickly from version 1 to version 8 which is the production model.  Mr. Packer states “We owe Robertson’s Ready Mix and their team a lot of respect and gratitude for their involvement.  Many of our newest changes and important discoveries came from constant operation on Robertson’s trucks performing in a 20 hour per day schedule.  We really couldn’t have tailor made a better beta site.  These truck are hard on our system and have tremendous demand on the system. This allowed us to make changes we otherwise could not have achieved without such a harsh and real-time environment. When it comes time for them to buy for the fleet, we won’t forget their allegiance. They’re a great bunch of guys, and the drivers were real troopers with data collection.  I look forward to serving them. We are getting the alternators and other supplies to begin switching out the older version 4 and 5 systems with the newest version 8 production line model.”

Speak Your Mind

*